Delayed at Dutch

    It is Wednesday and we are still docked at Dutch Harbor. The expedition has been delayed until a coffer dam has been built and installed. This repair on the starboard shaft will stop water from entering the ship.

    Repair discussion about the shaft at Dutch Harbor
    Discussion and decisions by the heads of the repair

    There have been several attempts to install the coffer dam but adjustments continue to be needed. Installing the coffer dam requires divers to enter the water and work several hours under the ship.

    Shaft repair at Dutch
    Lowering 1/2 of the coffer dam into the water

    Late last night the team was able to successfully fit the piece into the shaft. Spirits are higher today amongst the scientists and Coast Guard as we may be under sail later tonight.

    Video cam picture on the Healy
    Video cam picture of the shaft after the coffer dam installation. It appears to have stopped the water!

    Diver to repair shaft on Healy
    Repairs by diver

    Graduate student Austin Fox shared this short video of the diver jumping in to repair the shaft.

    http://youtu.be/W5PUaVON0iU